{"id":1939,"date":"2025-10-07T13:31:39","date_gmt":"2025-10-07T11:31:39","guid":{"rendered":"https:\/\/ontimesolutions.pl\/?p=1939"},"modified":"2025-11-11T13:57:00","modified_gmt":"2025-11-11T12:57:00","slug":"budowa-hali-produkcyjnej-krok-po-kroku-od-koncepcji-i-pozwolen-po-montaz-i-odbior","status":"publish","type":"post","link":"https:\/\/ontimesolutions.pl\/en\/step-by-step-construction-of-the-production-hall-from-conception-and-approval-to-assembly-and-commissioning\/","title":{"rendered":"Step-by-step construction of a production hall - from conception and permits to assembly and commissioning"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"1939\" class=\"elementor elementor-1939\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7bd63e24 e-flex e-con-boxed e-con e-parent\" data-id=\"7bd63e24\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9a7e889 elementor-widget elementor-widget-text-editor\" data-id=\"9a7e889\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t\n<p>You are planning <strong>investment<\/strong> modern <strong>Industrial object<\/strong>Whether you are interested in <strong>production hall<\/strong>, <strong>warehouse<\/strong>, whether mixed \u2013 the entire process should be well-planned to avoid errors and unnecessary costs. Below we present a practical guide in which we discuss <strong>step by step<\/strong> all stages: from selection <strong>plots<\/strong>, by obtaining <strong>building permits<\/strong>, up to <strong>Steel structure assembly<\/strong> and collection.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Building a production hall step by step \u2013 a guide for investors<\/strong><\/h2>\n\n\n\n<p>Building a production hall is a complex process that requires careful planning, knowledge of regulations, and a well-thought-out action strategy. In this guide, we present step-by-step how to carry out the investment safely and effectively \u2013 from site selection to the handover of the finished facility.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Where to start building a hall? Choosing a plot of land and analysing the location<\/strong><\/h2>\n\n\n\n<p>The first step is to choose the appropriate <strong>building plot<\/strong>which meets the functional and legal requirements. Key are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The shape of the plot<\/strong> \u2013 ideally uniformly shaped, close to a rectangle (easier <strong>Town and country planning<\/strong>).<\/li>\n\n\n\n<li><strong>Location<\/strong> \u2013 access to public roads, proximity to suppliers, customers or rail infrastructure.<\/li>\n\n\n\n<li><strong>Media and installations<\/strong> \u2013 connection for water, sewage, electricity and gas.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Planning permission or zoning plan<\/strong><\/h2>\n\n\n\n<p>Before purchasing a plot of land for a production or warehouse hall, be sure to check if the area is covered by a local spatial development plan (MPZP) and if it permits the construction of an industrial facility. If such a plan is not in effect, it will be necessary to obtain a zoning decision, which can take an average of 2 to 3 months. Early verification of these documents helps to avoid costly delays and uncertainty regarding the development possibilities of the plot.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Building project for a hall&nbsp;<\/strong><\/h2>\n\n\n\n<p><strong>Construction project<\/strong> This is one of the most important documents in the entire process. It should take into account both production requirements and building regulations. <strong>fire-fighting<\/strong> sanitary.<\/p>\n\n\n\n<p>It's worth starting with creating a few <strong>design concept variations<\/strong>, to better tailor the facility's functionality to the company's needs. The project shall specify:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>production, storage, and social-office areas<\/li>\n\n\n\n<li>transport system<\/li>\n\n\n\n<li>technical solutions and <strong>structural<\/strong> (e.g. type of steel construction)<\/li>\n\n\n\n<li>proposal for the future development of the facility (expansion, change of function).<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Obtaining a building permit for a hall<\/strong><\/h2>\n\n\n\n<p>To begin construction, the investor must <strong>obtain a building permit<\/strong>For this purpose, it is necessary to prepare <strong>complete design documentation<\/strong>which contains:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Architectural and construction project<\/li>\n\n\n\n<li>site and height maps<\/li>\n\n\n\n<li>opinions and agreements (including Sanitary Inspectorate, Fire Brigade, Energy Provider),<\/li>\n\n\n\n<li>Technical conditions for utility connections.<\/li>\n<\/ul>\n\n\n\n<p><strong>Warning:<\/strong> There is no need to attach detailed executive or installation designs. However, their absence may make further stages of implementation more difficult and increase <strong>Cost of construction<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Stages of steel hall construction<\/strong><\/h2>\n\n\n\n<p>Construction <strong>steel hull<\/strong> typically involves four main stages:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Stage<\/strong><\/td><td><strong>Scope of work<\/strong><\/td><td><strong>Key elements<\/strong><\/td><\/tr><tr><td>Preparation<\/td><td>Formalities, documentation, project<\/td><td>planning permission, permit, design<\/td><\/tr><tr><td>Prefabrication<\/td><td>Production of steel elements<\/td><td>Posts, beams, purlins, casing<\/td><\/tr><tr><td>3. Assembly<\/td><td>On-site construction assembly<\/td><td>fundament, assembly of structures, screws<\/td><\/tr><tr><td>4. Finishing<\/td><td>Installations, surroundings, acceptance<\/td><td>Electrical installation, flooring, access roads<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Assembly and finishing of the hall<\/strong><\/h2>\n\n\n\n<p>Following the granting of permission and the preparation of the site, the... <strong>Assembly<\/strong> <strong>Hello<\/strong>Key stages:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Earthworks<\/strong> \u2013 Levelling of the ground, preparation of the soil.<\/li>\n\n\n\n<li><strong>Foundations<\/strong> \u2013 execution of foundations and wall plates.<\/li>\n\n\n\n<li><strong>Steel construction<\/strong> \u2013 installation of posts, roof beams, bracing, purlins.<\/li>\n\n\n\n<li><strong>Hall casing<\/strong> - sandwich panels or trapezoidal sheet metal with insulation.<\/li>\n\n\n\n<li><strong>Installations<\/strong> \u2013 electrical, water and sewage, heating, ventilation.<\/li>\n\n\n\n<li><strong>Flooring and landscaping<\/strong> \u2013 including roads, car parks, green spaces.<\/li>\n<\/ol>\n\n\n\n<p>Well designed <strong>production hall<\/strong> It should be not only functional but also energy-efficient, aesthetically pleasing, and prepared for further expansion.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Technical acceptance and commissioning of the facility<\/strong><\/h2>\n\n\n\n<p>Following the completion of works, it is necessary to carry out <strong>completion of works<\/strong> by the relevant authorities. You will need:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>As-built documentation<\/li>\n\n\n\n<li>Research and measurement protocols<\/li>\n\n\n\n<li>arrangements <strong>fire-resistant<\/strong>,<\/li>\n\n\n\n<li>Energy performance certificates and material certificates.<\/li>\n<\/ul>\n\n\n\n<p>Only after a positive acceptance can the hall be used for its intended purpose.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How much does it cost to build a production hall?<\/strong><\/h2>\n\n\n\n<p><strong>Cost of building a steel hall<\/strong> It depends on many factors:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>surfaces<\/li>\n\n\n\n<li>object type (production, <strong>warehouse<\/strong>mixed),<\/li>\n\n\n\n<li>kind <strong>steel construction<\/strong>,<\/li>\n\n\n\n<li>kind <strong>installation<\/strong> and finishes,<\/li>\n\n\n\n<li>ground and location conditions.<\/li>\n<\/ul>\n\n\n\n<p>It's worth consulting with an experienced <strong>contractor<\/strong>who will prepare an investor's cost estimate and indicate possible savings (e.g. elimination of intermediate poles, selection of a ready-made hall system).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Realise your investment with On-Time Solutions<\/strong><\/h2>\n\n\n\n<p>If you are planning on building a modern <strong>Production hall<\/strong> Love <strong>Stock room<\/strong>, choose a trusted partner. On-Time Solutions specialises in designing and implementing <strong>steel structures<\/strong>, ensuring a quick <strong>lead time<\/strong>- high quality of workmanship and comprehensive support at every stage of the investment. Thanks to our experience and flexible approach, we will build a functional and durable facility tailored to your production and logistical needs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Summary&nbsp;<\/strong><\/h2>\n\n\n\n<p>The construction of a warehouse is a process that requires careful consideration at every stage \u2013 from site selection, through the building design and permits, to assembly and acceptance. Good planning, compliance with regulations, and cooperation with an experienced contractor are of key importance. Only then will investment in a modern industrial facility yield the expected results.<\/p>\n\n\n\n<p><\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4644307 elementor-widget elementor-widget-heading\" data-id=\"4644307\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ - Frequently asked questions<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f268d85 elementor-widget elementor-widget-n-accordion\" data-id=\"f268d85\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2540\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-2540\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Where to start if you are planning to build a production hall? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2540\" class=\"elementor-element elementor-element-176b6d9 e-con-full e-flex e-con e-child\" data-id=\"176b6d9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-188b33e elementor-widget elementor-widget-heading\" data-id=\"188b33e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The most important thing is to find a suitable building site, check the building and land use conditions, and then apply to the urban planning department for a decision or check the local spatial development plan. Only then is it worth proceeding with the design and formalities.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2541\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2541\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 2. Does every industrial hall require a permit? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2541\" class=\"elementor-element elementor-element-7427272 e-con-full e-flex e-con e-child\" data-id=\"7427272\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e0ebba9 elementor-widget elementor-widget-heading\" data-id=\"e0ebba9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">Yes, in most cases, the construction of an industrial hall requires a building permit, based on a properly prepared design. Very small, temporary structures may be an exception.<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2542\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2542\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 3. What are the main stages of constructing a production hall? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2542\" class=\"elementor-element elementor-element-335ee4a e-con-full e-flex e-con e-child\" data-id=\"335ee4a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ad65005 elementor-widget elementor-widget-heading\" data-id=\"ad65005\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The stages of building a production hall are: documentation and design, permits, earthworks and foundations, structural assembly, sandwich panel installation, installations and finishing, and finally, technical inspections are necessary.\n<\/span>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2543\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2543\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 4. What materials should the hall's casing be made from to reduce operating costs? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2543\" class=\"elementor-element elementor-element-447a74c e-flex e-con-boxed e-con e-child\" data-id=\"447a74c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bb54ec9 elementor-widget elementor-widget-heading\" data-id=\"bb54ec9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">Sandwich panels with mineral wool cores are a popular choice, offering good thermal and acoustic insulation. This will result in lower heating and cooling costs for the hall.\n<\/span>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2544\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2544\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 5. How long does the process of building a hall take step by step? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2544\" class=\"elementor-element elementor-element-17897f5 e-flex e-con-boxed e-con e-child\" data-id=\"17897f5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a2b95da elementor-widget elementor-widget-heading\" data-id=\"a2b95da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The construction process takes from several months to over a year, depending on the project's scale, material availability, weather conditions, and administrative procedures. The speed also depends on the contractor's experience and the readiness of the documentation.\n<\/span>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2545\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2545\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 6. Can I plan to extend the hall in the future? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2545\" class=\"elementor-element elementor-element-1a5454f e-flex e-con-boxed e-con e-child\" data-id=\"1a5454f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-af18069 elementor-widget elementor-widget-heading\" data-id=\"af18069\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">Yes, if you are planning to build a hall today, it is worth considering the possibility of extending the hall in the project \u2013 through appropriate placement of the structure, land reserve or modular technological solutions.\n<\/span>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2546\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2546\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 7. Why is it worth having a project prepared before applying for a permit? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2546\" class=\"elementor-element elementor-element-c7a5adc e-flex e-con-boxed e-con e-child\" data-id=\"c7a5adc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-82f8ea0 elementor-widget elementor-widget-heading\" data-id=\"82f8ea0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<span class=\"elementor-heading-title elementor-size-default\">The prepared project allows for faster project implementation, minimises the risk of errors, and enables better control over project costs and on-site construction work.<\/span>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<script type=\"application\/ld+json\">{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"1. Od czego zacz\\u0105\\u0107, je\\u015bli planujesz budow\\u0119 hali produkcyjnej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Najwa\\u017cniejsze to znale\\u017a\\u0107 odpowiednie miejsce budowy, sprawdzi\\u0107 warunkach zabudowy i zagospodarowania, a nast\\u0119pnie wyst\\u0105pi\\u0107 w wydziale urbanistyki o decyzj\\u0119 lub sprawdzi\\u0107 zapisy MPZP. Dopiero potem warto przyst\\u0119powa\\u0107 do projektu i formalno\\u015bci.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"2. Czy ka\\u017cda hala przemys\\u0142owa wymaga pozwolenia?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Tak, w wi\\u0119kszo\\u015bci przypadk\\u00f3w budowa hali przemys\\u0142owej wymaga pozwolenia na budow\\u0119, opartego na odpowiednio przygotowanym projekcie. Wyj\\u0105tkiem mog\\u0105 by\\u0107 bardzo ma\\u0142e, tymczasowe obiekty.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"3. Jakie s\\u0105 g\\u0142\\u00f3wne etapy budowy hali produkcyjnej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Etapy budowy hali produkcyjnej to: dokumentacja i projekt, pozwolenia, prace ziemne i fundamenty, monta\\u017c konstrukcji, monta\\u017c p\\u0142yt warstwowych, instalacje i wyko\\u0144czenia, a na ko\\u0144cu \\u2013 konieczne jest przeprowadzenie odbior\\u00f3w technicznych.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"4. Z jakich materia\\u0142\\u00f3w wykona\\u0107 obudow\\u0119 hali, by zmniejszy\\u0107 koszty eksploatacji?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Popularnym wyborem s\\u0105 p\\u0142yty warstwowe z rdzeniem z we\\u0142ny mineralnej, kt\\u00f3re zapewniaj\\u0105 dobr\\u0105 izolacj\\u0119 termiczn\\u0105 i akustyczn\\u0105. Dzi\\u0119ki temu uzyskujesz ni\\u017csze koszty ogrzewania i ch\\u0142odzenia hali.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"5. Ile trwa proces budowy hali krok po kroku?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Proces budowy trwa od kilku do kilkunastu miesi\\u0119cy, w zale\\u017cno\\u015bci od skali projektu, dost\\u0119pno\\u015bci materia\\u0142\\u00f3w, pogody i formalno\\u015bci. Szybko\\u015b\\u0107 zale\\u017cy te\\u017c od do\\u015bwiadczenia wykonawcy i gotowo\\u015bci dokumentacji.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"6. Czy mog\\u0119 zaplanowa\\u0107 rozbudow\\u0119 hali w przysz\\u0142o\\u015bci?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Tak, je\\u015bli ju\\u017c dzi\\u015b planujesz budow\\u0119 hali, warto w projekcie uwzgl\\u0119dni\\u0107 mo\\u017cliwo\\u015b\\u0107 rozbudowy hali \\u2013 poprzez odpowiednie rozmieszczenie konstrukcji, rezerw\\u0119 terenu czy modularne rozwi\\u0105zania technologiczne.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"7. Dlaczego warto mie\\u0107 przygotowany projekt przed wyst\\u0105pieniem o pozwolenie?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Przygotowany projekt umo\\u017cliwia szybsz\\u0105 realizacj\\u0119 inwestycji, minimalizuje ryzyko b\\u0142\\u0119d\\u00f3w i pozwala lepiej kontrolowa\\u0107 koszty realizacji projektu oraz prace budowlane na miejscu.\"\n            }\n        }\n    ]\n}<\/script>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Are you planning to invest in a modern industrial facility? Whether you're interested in a production hall, warehouse, or a mixed-use facility \u2013 the entire process needs to be well-planned to avoid mistakes and unnecessary costs. Below, we present a practical guide in which we discuss all the stages step-by-step: from plot selection, through obtaining a building permit, to the assembly of the steel structure and final acceptance. Building [...]<\/p>","protected":false},"author":1,"featured_media":1940,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1939","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/1939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/comments?post=1939"}],"version-history":[{"count":10,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/1939\/revisions"}],"predecessor-version":[{"id":1951,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/1939\/revisions\/1951"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/media\/1940"}],"wp:attachment":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/media?parent=1939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/categories?post=1939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/tags?post=1939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}