{"id":2047,"date":"2025-12-16T09:04:51","date_gmt":"2025-12-16T08:04:51","guid":{"rendered":"https:\/\/ontimesolutions.pl\/?p=2047"},"modified":"2026-01-28T13:53:24","modified_gmt":"2026-01-28T12:53:24","slug":"ile-czasu-trwa-budowa-hali-stalowej","status":"publish","type":"post","link":"https:\/\/ontimesolutions.pl\/en\/how-long-does-the-construction-of-a-steel-hall-take\/","title":{"rendered":"How long does it take to build a steel hall?"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"2047\" class=\"elementor elementor-2047\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-362e3f33 e-flex e-con-boxed e-con e-parent\" data-id=\"362e3f33\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1d2036e9 tekst-kolorowanie-linkowanie elementor-widget elementor-widget-text-editor\" data-id=\"1d2036e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><strong>Steel hall construction<\/strong> This is a complex and multi-stage process that requires investors not only to have sufficient financial resources but, above all, time, planning, and knowledge of formal procedures. Although for many entrepreneurs, farmers, or investors in the sector <strong>industrial<\/strong>, warehouse or <strong>production<\/strong>, it is crucial to complete the implementation quickly, the construction time of the hall depends on a number of factors, both legal and technical.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading --><\/p>\n<h2><strong>Stages of steel hall construction<\/strong><\/h2>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>The investment implementation period should be considered in two main stages:<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:list {\"ordered\":true} --><\/p>\n<ol>\n<li style=\"list-style-type: none;\">\n<ol><!-- wp:list-item --><\/ol>\n<\/li>\n<\/ol>\n<ol>\n<li style=\"list-style-type: none;\">\n<ol>\n<li><strong>Formal and design preparations (pre-construction phase)<\/strong><\/li>\n<li><strong>The correct construction of a steel hall (construction and assembly phase)<\/strong><\/li><\/ol><\/li><\/ol>\n<p><!-- \/wp:list-item --><\/p>\n<p><!-- \/wp:list --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>1. Formal stage \u2013 how long does it last and what does it cover?<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Before the construction company begins assembling the structure, the investor must go through a series of formalities. This phase usually lasts <strong>from 3 to even 12 months<\/strong>, depending on the location and complexity of the project.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading {\"level\":4} --><\/p>\n<h4><strong>What do the preparations include?<\/strong><\/h4>\n<p><!-- \/wp:heading --><!-- wp:list --><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul><!-- wp:list-item --><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li><strong>Choosing a plot<\/strong> Ground condition analysis<\/li>\n<li>Preparation of a map for design purposes and obtaining a building permit<\/li>\n<li>Development <strong>building project<\/strong> and the concept of land development<\/li>\n<li>Acquisition <strong>building permits<\/strong> \u2013 this is one of the most important stages. Although the regulations stipulate that the office should issue a decision within 65 days, in practice, this can take much longer \u2013 even <strong>a few months<\/strong>especially when the documentation needs to be supplemented&nbsp;<\/li><\/ul><\/li><\/ul>\n<p><!-- \/wp:list-item --><\/p>\n<p><!-- \/wp:list --><!-- wp:heading {\"level\":4} --><\/p>\n<h4><strong>It's worth remembering:<\/strong><\/h4>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Obtaining an environmental decision, connection conditions, a geological opinion or technical approvals can extend the entire process. In some cases, e.g. with properties <strong>agricultural<\/strong>the procedure can be simplified somewhat, but still requires careful document preparation.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>2. Construction phase \u2013 how long does the construction of a steel hall take?<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Once planning permission has been granted, the actual construction of the facility can begin. For halls with an area of 1500 to 3000 m\u00b2, the construction time is usually <strong>From 5 to 9 months<\/strong>A well-planned and managed investment can, however, end in <strong>4 months<\/strong>. especially under favourable weather conditions and with no logistical delays.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading --><\/p>\n<h2><strong>What influences the construction time of a steel hall?<\/strong><\/h2>\n<p><!-- \/wp:heading --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>1. Detailed design and project documentation<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Reliably prepared <strong>Execution plan<\/strong> It allows for a reduced assembly time, avoiding errors and construction conflicts. Gaps in documentation can delay the schedule by several weeks.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>2. Type and size of hall<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>The larger <strong>Steel mill<\/strong>the more elements to assemble, the longer the time for groundwork and the roof and wall cladding. For example:<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:list --><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul><!-- wp:list-item --><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Hello <strong>warehouse<\/strong> A simple structure and small volume can be built in 4-5 months.<\/li>\n<li>Hello <strong>production<\/strong> with the system <strong>heating<\/strong>, cranes and an extensive electrical installation \u2013 even 7-8 months.<\/li>\n<li>Hello <strong>Industrial<\/strong> With social and office spaces and specialist installations, this may require 9 months.<\/li><\/ul><\/li><\/ul>\n<p><!-- \/wp:list-item --><\/p>\n<p><!-- \/wp:list --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>3. Ground conditions and site preparation<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Preparation <strong>foundations<\/strong> The sub-base and subfloor depends on the ground. Ground with poor load-bearing capacity requires reinforcement, which can extend the construction time by up to several weeks. Earthworks and foundation works for a facility of approx. 2000 m\u00b2 usually take <strong>4-6 weeks<\/strong>.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>4. Steel structure and roof assembly<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Prefabricated steel elements are delivered to the construction site and joined by bolts or welding. Assembly <a href=\"https:\/\/ontimesolutions.pl\/en\/steel-structures\/\">steel construction<\/a> and roofing <strong>roof<\/strong> lasts on average <strong>6\u20138 weeks<\/strong>, depending on the availability of materials, the complexity of the construction, and the weather.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>5. Installations and finishing works<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Mounting <strong>installation<\/strong> (electrical, water and sewage, ventilation, heating systems, etc.), interior finishing, construction of access roads, <strong>land development<\/strong> And fencing is the final stage. Depending on the scope, it takes between 3 to 6 weeks.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading --><\/p>\n<h2><strong>A steel hall in 4 months \u2013 is that possible?<\/strong><\/h2>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>Yes, <strong>Steel hall construction<\/strong> in 4 months is possible, but requires:<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:list --><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul><!-- wp:list-item --><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>A complete set of approved documents and <strong>building permits<\/strong><\/li>\n<li>Simpler hall construction (e.g. <strong>Warehouse hall<\/strong> (without heating and welfare facilities)<\/li>\n<li>Favourable weather conditions<\/li>\n<li>Experienced contractor with good material logistics<\/li>\n<li>No delays in the delivery of steel components<\/li><\/ul><\/li><\/ul>\n<p><!-- \/wp:list-item --><\/p>\n<p><!-- \/wp:list --><!-- wp:heading {\"level\":3} --><\/p>\n<h3><strong>Modern steel halls from ON-Time Solution \u2013 comprehensive offer from design to assembly<\/strong><\/h3>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>ON-Time Solution offers modern&nbsp;<a href=\"https:\/\/ontimesolutions.pl\/en\/steel-halls\/\" target=\"_blank\" rel=\"noopener\">Steel halls<\/a>&nbsp;designed for efficiency, durability and rapid assembly. We provide full support: from the execution <strong>hall documentation<\/strong> needed for <strong>obtaining a building permit<\/strong>, right up to the assembly <strong>structural elements<\/strong>.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>Our solutions are tailored to the needs of various industries, and <strong>Cost of steel hall construction<\/strong> is always based on individual <strong>calculation<\/strong> \u2013 taking into account the intended purpose, <strong>wingspan<\/strong>thermal insulation parameters and expected <strong>running costs<\/strong>.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading --><\/p>\n<h2><strong>Summary<\/strong><\/h2>\n<p><!-- \/wp:heading --><!-- wp:paragraph --><\/p>\n<p>The construction time for a steel hall can vary <strong>4 to 9 months<\/strong>, but the full duration of the entire investment \u2013 including obtaining documentation and administrative decisions \u2013 is even <strong>12\u201314 months<\/strong>It is crucial to choose an experienced contractor who will not only help with the actual <strong>assembly<\/strong>but also at the design and formal stage, shortening waiting times.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p>Regardless of whether you are planning <a href=\"https:\/\/ontimesolutions.pl\/en\/steel-halls\/warehouse-halls\/\">warehouse<\/a>, <a href=\"https:\/\/ontimesolutions.pl\/en\/steel-halls\/production-hall\/\">production<\/a>, <a href=\"https:\/\/ontimesolutions.pl\/en\/steel-halls\/farm-buildings\/\">agricultural<\/a> if <a href=\"https:\/\/ontimesolutions.pl\/en\/steel-halls\/industrial-halls\/\">industrial<\/a>Remember that a well-prepared investment saves time, money, and nerves. That's why it's worth starting the construction of a hall with <strong>reliable valuation<\/strong>, checking of building conditions and preparation of a complete <strong>project documentation<\/strong>.<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:heading --><\/p>\n<h2><strong>FAQ - Frequently asked questions<\/strong><\/h2>\n<p><!-- \/wp:heading --><!-- wp:heading {\"level\":3} --><!-- \/wp:paragraph --><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2533f6c e-flex e-con-boxed e-con e-parent\" data-id=\"2533f6c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a81a43d elementor-widget elementor-widget-n-accordion\" data-id=\"a81a43d\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;expanded&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1760\" class=\"e-n-accordion-item\" open>\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-1760\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> How much does it cost to build a steel hall? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1760\" class=\"elementor-element elementor-element-7b3aeba e-con-full e-flex e-con e-child\" data-id=\"7b3aeba\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1760\" class=\"elementor-element elementor-element-d3f8340 e-flex e-con-boxed e-con e-child\" data-id=\"d3f8340\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bb7cbd4 elementor-widget elementor-widget-heading\" data-id=\"bb7cbd4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The cost depends on many factors, including hall size, materials used, equipment, and labour costs \u2013 estimated from \u00a31500 to \u00a33000 per m\u00b2 net.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1761\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1761\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> What influences the price of building a steel hall? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1761\" class=\"elementor-element elementor-element-53446d5 e-con-full e-flex e-con e-child\" data-id=\"53446d5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1761\" class=\"elementor-element elementor-element-29f6151 e-flex e-con-boxed e-con e-child\" data-id=\"29f6151\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-95b3337 elementor-widget elementor-widget-heading\" data-id=\"95b3337\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The factors influencing the price include: the span of the structure, the number of columns and supports, the type of cladding (e.g. sandwich panels, trapezoidal sheet metal), fittings, as well as the location and ground conditions of the construction site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1762\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1762\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> Does every steel hall require planning permission? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1762\" class=\"elementor-element elementor-element-d6e9f95 e-con-full e-flex e-con e-child\" data-id=\"d6e9f95\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1762\" class=\"elementor-element elementor-element-a62e575 e-flex e-con-boxed e-con e-child\" data-id=\"a62e575\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-09798e8 elementor-widget elementor-widget-heading\" data-id=\"09798e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">\nYes, every major investment \u2013 including small warehouses \u2013 requires a building permit, unless they are temporary structures that meet specific legal requirements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1763\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1763\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> What does the process of obtaining a building permit for a steel hall look like? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1763\" class=\"elementor-element elementor-element-2e62737 e-con-full e-flex e-con e-child\" data-id=\"2e62737\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1763\" class=\"elementor-element elementor-element-73b45f2 e-flex e-con-boxed e-con e-child\" data-id=\"73b45f2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e447d0c elementor-widget elementor-widget-heading\" data-id=\"e447d0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The process begins with obtaining a decision on planning conditions, preparing the design, and submitting the documentation to the office \u2013 the total time can range from 3 to 6 months.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1764\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1764\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> Szczeg\u00f3\u0142y konstrukcyjne hali stalowej. <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1764\" class=\"elementor-element elementor-element-4c36a0d e-con-full e-flex e-con e-child\" data-id=\"4c36a0d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1764\" class=\"elementor-element elementor-element-bbd59d6 e-flex e-con-boxed e-con e-child\" data-id=\"bbd59d6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-aab87ef elementor-widget elementor-widget-heading\" data-id=\"aab87ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The framework is mainly formed by columns, beams, profiles and connecting elements \u2013 this is the so-called load-bearing structure, designed to carry all loads.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1765\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1765\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> What wall and roof cladding can be used? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1765\" class=\"elementor-element elementor-element-8dd49a2 e-con-full e-flex e-con e-child\" data-id=\"8dd49a2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1765\" class=\"elementor-element elementor-element-9d742de e-flex e-con-boxed e-con e-child\" data-id=\"9d742de\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ff48f02 elementor-widget elementor-widget-heading\" data-id=\"ff48f02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Sandwich panels are most commonly used (for better thermal insulation) or corrugated metal sheets, which are a cheaper alternative with lower insulation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1766\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1766\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> What is inside the hall once construction is completed? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1766\" class=\"elementor-element elementor-element-1846282 e-con-full e-flex e-con e-child\" data-id=\"1846282\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1766\" class=\"elementor-element elementor-element-6afbc1c e-flex e-con-boxed e-con e-child\" data-id=\"6afbc1c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-59dac23 elementor-widget elementor-widget-heading\" data-id=\"59dac23\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Depending on their purpose, the interior of the hall may contain social rooms, installations, overhead cranes, heating or ventilation systems.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-1767\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1767\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><h3 class=\"e-n-accordion-item-title-text\"> Does ON-Time Solution offer a guarantee on their halls? <\/h3><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-minus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h384c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-plus\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 208H272V64c0-17.67-14.33-32-32-32h-32c-17.67 0-32 14.33-32 32v144H32c-17.67 0-32 14.33-32 32v32c0 17.67 14.33 32 32 32h144v144c0 17.67 14.33 32 32 32h32c17.67 0 32-14.33 32-32V304h144c17.67 0 32-14.33 32-32v-32c0-17.67-14.33-32-32-32z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1767\" class=\"elementor-element elementor-element-d37e5a6 e-con-full e-flex e-con e-child\" data-id=\"d37e5a6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-1767\" class=\"elementor-element elementor-element-9911e26 e-flex e-con-boxed e-con e-child\" data-id=\"9911e26\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1f04653 elementor-widget elementor-widget-heading\" data-id=\"1f04653\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Yes, all our steel halls are covered by a warranty on the structure and cladding \u2013 details are included in the individual offer.<\/p>\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<script type=\"application\/ld+json\">{\n    \"@context\": \"https:\\\/\\\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Ile kosztuje budowa hali stalowej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Koszt zale\\u017cy od wielu czynnik\\u00f3w, m.in. rozmiaru hali, u\\u017cytych materia\\u0142\\u00f3w, wyposa\\u017cenia oraz cen robocizny \\u2013 szacunkowo od 1500 do 3000 z\\u0142\\\/m\\u00b2 netto.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Co wp\\u0142ywa na cen\\u0119 budowy hali stalowej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Na to, czego zale\\u017cy cena, sk\\u0142adaj\\u0105 si\\u0119: rozpi\\u0119to\\u015b\\u0107 konstrukcji, liczba s\\u0142up\\u00f3w i podp\\u00f3r, typ poszycia (np. p\\u0142yty warstwowe, blacha trapezowa), wyposa\\u017cenie, a tak\\u017ce lokalizacja i warunki gruntowe placu budowy.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Czy ka\\u017cda hala stalowa wymaga pozwolenia na budow\\u0119?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Tak, ka\\u017cda wi\\u0119ksza inwestycja \\u2013 tak\\u017ce ma\\u0142e hale \\u2013 wymaga pozwolenia na budow\\u0119, chyba \\u017ce s\\u0105 to obiekty tymczasowe, spe\\u0142niaj\\u0105ce konkretne wymogi prawne.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Jak wygl\\u0105da proces uzyskania pozwolenia na budow\\u0119 hali stalowej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Rozpoczyna si\\u0119 od uzyskania decyzji o warunkach zabudowy, wykonania projektu i z\\u0142o\\u017cenia dokumentacji w urz\\u0119dzie \\u2013 \\u0142\\u0105czny czas mo\\u017ce wynie\\u015b\\u0107 od 3 do 6 miesi\\u0119cy.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Z czego sk\\u0142ada si\\u0119 szkielet hali stalowej?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Szkielet tworz\\u0105 g\\u0142\\u00f3wnie s\\u0142upy, rygle, profile oraz elementy \\u0142\\u0105cz\\u0105ce \\u2013 to tzw. konstrukcja no\\u015bna, zaprojektowana do przenoszenia wszystkich obci\\u0105\\u017ce\\u0144.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Jakie poszycie \\u015bcian i dachu mo\\u017cna zastosowa\\u0107?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Najcz\\u0119\\u015bciej stosuje si\\u0119 p\\u0142yty warstwowe (dla lepszej izolacyjno\\u015bci termicznej) lub blach\\u0119 trapezow\\u0105, kt\\u00f3ra jest ta\\u0144sz\\u0105 alternatyw\\u0105 o mniejszej izolacyjno\\u015bci.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Co znajduje si\\u0119 wewn\\u0105trz hali po zako\\u0144czeniu budowy?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"W zale\\u017cno\\u015bci od przeznaczenia, wewn\\u0105trz hali mog\\u0105 znajdowa\\u0107 si\\u0119 pomieszczenia socjalne, instalacje, suwnice, systemy ogrzewania czy wentylacji.\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Czy ON-Time Solution daje gwarancj\\u0119 na swoje hale?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Tak, wszystkie nasze hale stalowe obj\\u0119te s\\u0105 gwarancj\\u0105 na konstrukcj\\u0119 i poszycie \\u2013 szczeg\\u00f3\\u0142y zawarte s\\u0105 w indywidualnej ofercie.\"\n            }\n        }\n    ]\n}<\/script>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Budowa hali stalowej to z\u0142o\u017cony i wieloetapowy proces, kt\u00f3ry od inwestora wymaga nie tylko odpowiednich \u015brodk\u00f3w finansowych, ale przede wszystkim \u2013 czasu, planowania oraz znajomo\u015bci procedur formalnych. Cho\u0107 dla wielu przedsi\u0119biorc\u00f3w, rolnik\u00f3w czy inwestor\u00f3w z sektora przemys\u0142owego, magazynowego czy produkcyjnego, kluczowe jest szybkie zako\u0144czenie realizacji, czas budowy hali zale\u017cy od szeregu czynnik\u00f3w, zar\u00f3wno prawnych, jak [&hellip;]<\/p>","protected":false},"author":1,"featured_media":2048,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2047","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"acf":[],"_links":{"self":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/2047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/comments?post=2047"}],"version-history":[{"count":10,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/2047\/revisions"}],"predecessor-version":[{"id":2314,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/posts\/2047\/revisions\/2314"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/media\/2048"}],"wp:attachment":[{"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/media?parent=2047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/categories?post=2047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ontimesolutions.pl\/en\/wp-json\/wp\/v2\/tags?post=2047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}